Blog
Discover our latest articles and blogs

RIBA Stages and Quantities: What a QS Measures at Each Stage
What quantity information a UK quantity surveyor can measure at each RIBA Plan of Work 2020 stage, from Stage 0 estimates to the Stage 4 Bill of Quantities.

Staircase Takeoff: Measuring Stairs for an NRM2 BoQ
How UK quantity surveyors take off a staircase: drawings needed, what NRM2 deems included, in-situ concrete method, a worked example and double-count checks.

Change Control for Quantities: A Practical Guide for QSs
How UK quantity surveyors control changes to measured quantities: spotting triggers, remeasuring, valuing under JCT and NEC, and keeping an audit trail.

BoQ Item Numbering: How to Code Items under NRM2
How to number bill of quantities items under NRM2: choose the breakdown, build unique codes, order items and handle new, omitted or revised lines.

Measurement Assumptions Log: What UK QSs Should Record
A measurement assumptions log records every gap you bridge when taking off. See what to record, worked examples and how to keep it current as drawings change.

Temporary Works Quantities: How to Measure and Price Them
How UK quantity surveyors identify, measure and describe temporary works quantities under NRM2, from scaffolding and propping to hire periods and registers.

Skirting Takeoff: How to Measure Skirtings From Drawings
How to take off skirting from drawings in linear metres: check the scale, measure each run, deal with doors and returns, apply NRM2 and record it for checking.

Metric vs imperial in UK construction: what QSs need to know
UK construction is metric on paper, but imperial survives in trade names, old buildings and components. See which units to measure in and how to convert safely.

Drawing Sheet Indexing: How to Build and Check a Reliable Index
How to build, number, order and check a drawing sheet index for a UK construction set, and keep it matched to revisions and issued PDFs.