Blog
Discover our latest articles and blogs

Drylining Takeoff: A Practical Method for UK Quantity Surveyors
How to take off drylining from drawings: partitions, linings, ceilings, boards, studs, openings and waste, organised so the quantities can be checked and priced.

Door Ironmongery Takeoff: A Method for UK Quantity Surveyors
How to take off door ironmongery for a UK bill of quantities: documents to gather, a step-by-step count, fire and access checks, and common errors to avoid.

Schedule of Works vs BoQ: Which Document Fits Your Project?
A schedule of works lists the work without firm quantities. A bill of quantities fixes them. See how they differ and which suits your UK tender or contract.

NRM2 Item Coding: How Bill of Quantities Codes Are Built
How NRM2 item coding works in a bill of quantities: the seven levels, a worked code, the three breakdown structures and the mistakes that cause reconciliation problems.

Linking Specifications and Drawings to Your BoQ Items
How UK quantity surveyors link specifications and drawings to bill of quantities items: a reference structure, a step-by-step process, revision control and checks.

Paving and Cladding Takeoff: A Method for UK Quantity Surveyors
How to prepare a paving takeoff and a cladding takeoff from UK drawings and specifications: components, units, NRM 2 conventions, worked example and checks.

How to Import a Rate Library into a BoQ Workflow
How UK quantity surveyors can import a rate library into a bill of quantities workflow: clean the file, map NRM2 fields, check rates, and price imported materials.

BoQ Tender Qualifications: What to Include and What to Avoid
How UK quantity surveyors should handle qualifications to a priced BoQ: when to raise a clarification, how to word an exclusion, and what evaluators do next.

QS Role Permissions: Who Should See and Change What
How to set role permissions for a quantity surveying team: who edits quantities, who sees rates, who signs off, and how to review access over time.