Blog
Discover our latest articles and blogs

How to Assign Takeoff Tasks in a UK QS Team
A practical guide for UK quantity surveyors on splitting takeoff work by trade, drawing or floor, briefing each task, and keeping every measurement checkable.

BoQ CSV Export: Fields, Format and Checks Before You Issue
How to export a bill of quantities to CSV: the fields to include, formatting traps, checks before issuing, and when Excel or PDF is the better format.

Change Log in a BoQ: What to Record and How to Keep It
How to set up a change log for a Bill of Quantities: the fields to record, how variations are valued, and when the HRB change control log applies.

BoQ PDF Export: What a Tender-Ready Bill Needs
How UK quantity surveyors should export a bill of quantities to PDF: structure, checks, when to issue Excel as well, and accessibility rules for public clients.

How to Update Rates in a BoQ: A Guide for UK QSs
How UK quantity surveyors update rates in a bill of quantities: pick the right index, test trade packages, adjust preliminaries and keep an audit trail.

NRM2 Trade Boundaries: Where One Work Section Ends
How NRM2 work sections divide a bill of quantities, where items fall between them, and how to record boundary decisions so your take-off stays auditable.

Measuring Variations for UK QSs: NRM2 From Instruction to Record
UK quantity surveyors can follow an NRM2 workflow from written instructions and contract clauses through valuation to the records supporting a final account.

Plasterboard Takeoff: Six Steps UK QSs Can Audit Before Tender
Measure plasterboard room by room, apply NRM2 and manufacturer fixing rules, then prepare a traceable draft bill of quantities for tender review.

Rate Build Up vs Library Rates: How UK QSs Price Risky BoQ Items
Learn when UK quantity surveyors should build up rates from labour, plant and materials, and when to rebase library rates for an NRM2 bill of quantities.