Blog

Discover our latest articles and blogs

Brickwork quantities: a practical method for accurate ordering
September 17, 2026

Brickwork quantities: a practical method for accurate ordering

Calculate brickwork quantities using the 60/m² rule. Includes a step-by-step worked example, wastage and pallet guidance, mortar conversions, and when to...

Six Steps to an Audit Ready Cut and Fill Takeoff for UK QSs
September 16, 2026

Six Steps to an Audit Ready Cut and Fill Takeoff for UK QSs

Build an audit ready cut and fill takeoff for UK QSs. Map TIN, grid and cross section methods to NRM2, follow six practical stages and QA checks.

Stop Final Account Disputes: NRM2 Prime Cost Sums for UK QSs
September 15, 2026

Stop Final Account Disputes: NRM2 Prime Cost Sums for UK QSs

NRM2 guidance for UK quantity surveyors on drafting and pricing prime cost sums in BoQs. Checklists and practical checks to avoid final account disputes.

Stop Tender Queries: NRM2 Painting Takeoff Workflow for UK Estimators
September 14, 2026

Stop Tender Queries: NRM2 Painting Takeoff Workflow for UK Estimators

Follow a NRM2 painting takeoff workflow for UK estimators: five step measurement, coat and coverage adjustments, BoQ mapping, QA checklist.

NRM2 Ready 5 Step Structural Steel Takeoff for UK Estimators
September 13, 2026

NRM2 Ready 5 Step Structural Steel Takeoff for UK Estimators

UK estimators' practical method to produce NRM2 compliant structural steel BoQs in 5 steps, with digital QA and a QuantiFlow draft option.

Audit Ready Electrical Takeoff for QSs: 5–15 Minute NRM2 QA
September 12, 2026

Audit Ready Electrical Takeoff for QSs: 5–15 Minute NRM2 QA

Lean, audit ready NRM2 workflow for quantity surveyors: step by step electrical takeoff with brief QA checks, reconciliation tips and draft output options.

Build Audit Ready Gates for Human in the Loop AI
September 11, 2026

Build Audit Ready Gates for Human in the Loop AI

Practical, governance-first steps to make human in the loop AI audit-ready: where to place blocking gates, what audit logs to capture, and how to balance...

Estimators: Stop 10–15% Cost Drift with Live Construction Rates
September 10, 2026

Estimators: Stop 10–15% Cost Drift with Live Construction Rates

Practical guide for estimators to use supplier-sourced live construction rates, verify sourcing and timestamps, and integrate prices into audit-ready bids...

Stop Final Account Disputes on Remeasurement Contracts: NRM2 BoQs for QSs
September 9, 2026

Stop Final Account Disputes on Remeasurement Contracts: NRM2 BoQs for QSs

Measurement-first guidance for quantity surveyors on remeasurement contracts: use NRM2 BoQs, joint measurement and audit trails to reduce final account...