To overlay drawing revisions, you place the new issue on top of the old one in contrasting colours, align both sheets on fixed points, and treat every colour fringe as a place to look, not as a confirmed change. For a quantity surveyor the overlay is only the middle of the job. The result is useful when you have first confirmed that you are comparing the right pair of sheets, and when you carry each confirmed change into the take-off with its revision recorded.
This guide covers that whole sequence for UK SME surveyors, builders and architects: what an overlay shows, what to check before you run one, where it misleads, and how to turn the findings into a revised Bill of Quantities.
TL;DR
- An overlay shows geometry that has moved or been added. It is weak on notes, schedules and re-plotted sheets, so read those separately.
- Most errors come from comparing the wrong two issues. Check drawing number, revision, status, scale and paper size first.
- Clouds and delta tags are a starting point. Changes without a cloud are the ones to raise with the design team.
- Re-measure only the changed areas, keep the old measurement until the new one is checked, and record the source revision on every BoQ line.
- Save the comparison with the date and both revisions as your evidence.
Table of Contents
- What a drawing overlay actually does
- Before you overlay: confirm you have the right pair
- How to overlay two revisions, step by step
- Why clouds and covering notes are not enough
- Where overlays mislead
- Carrying confirmed changes into the take-off
- Keeping a clear record of issues
- Where QuantiFlow fits
- FAQ
- Sources
What a drawing overlay actually does
An overlay lays two versions of a drawing over each other and gives each a different colour. Anything common to both shows in a shared tone, and anything that has moved, been added or been removed shows as a fringe or a patch in one colour only. The idea is the old tracing-paper habit of laying one print over another on a light table, done digitally on PDFs.
The value is speed on geometry. A shifted wall, a relocated opening or a revised external dimension is far quicker to spot as a colour fringe than by flicking between two sheets. The limit is that the overlay compares pixels or lines, not meaning. A coloured fringe can mean a real design change, a sheet that was re-plotted slightly differently, or an export setting that has shifted the title block. That is why the result is a list of places to check, not a list of changes.
A useful way to think about the output comes from the UK guidance on revision takeoffs: a revision comparison is a controlled comparison between a defined baseline issue and a later issue, and its main product is a traceable record of what was added, omitted, moved or substituted, not just a new total. That record is what lets you explain a variation to a client or a main contractor later.
Before you overlay: confirm you have the right pair
The most common failure is not a missed line. It is comparing two sheets that should never have been compared, or building a price from a sheet that has already been superseded. Spend two minutes on these checks before you open any overlay tool.
Confirm the new issue is a proper issue
On a project run to BS EN ISO 19650, the status code tells you what a document may be used for. The UK BIM Framework's guidance explains that a container under review (status S3) should not be used for contractual purposes such as procuring materials, agreeing contract costs or constructing the works. Information issued for construction should carry a Published status code. If you are about to reprice, check the status in the common data environment (CDE), not the filename.
The UK revision pattern is worth knowing. Preliminary revisions run P01, P02 and so on, and published contractual revisions run C01, C02, with decimal revisions such as P01.01 staying inside the author's own team. If a decimal revision turns up in your pack, ask why.
Check the sheet details match
For each sheet pair, confirm:
- drawing number and title
- revision identifier and issue date
- status (information, coordination, construction)
- scale, paper size and orientation
- whether the new issue supersedes or supplements the baseline
- whether referenced drawings and specifications were issued at the same time
The same UK guide advises confirming the new issue through the transmittal or CDE notification and registering a query if any of these controls is unclear, before you treat the document as the new commercial baseline. Match sheets by drawing number, never by page order: a sheet inserted early in a PDF set shifts every page after it.
Read the revision letters correctly
The current revision is the one furthest along the sequence, and the revision box and the latest line in the revision table should agree. If they disagree, the drawing contradicts itself and the query goes to the design team. Remember also that a printed sheet only shows the revision it was printed at.
When offices use letters, I and O are normally skipped because they read as 1 and 0 on a poor print, and many also skip Q. Be wary of a set that mixes letters and numbers, such as a Rev C beside a Rev 3: it becomes impossible to say which is later without checking the register.
How to overlay two revisions, step by step

1. Freeze the baseline
Before you touch the new issue, duplicate your existing take-off and mark the original read-only. Record its file name, revision, date, author and approval state. Keeping it retrievable after the new issue is complete means you can reconstruct the tender figure or an earlier valuation if it is questioned. Where it goes wrong: surveyors overwrite the original measurements, then cannot report the change, only the new total.
2. Prepare both PDFs
Where you can, use PDFs exported from the same CAD package with the same settings. Different export settings create rendering differences that show up as false fringes. Check the scale and page size are the same. A sheet printed "fit to page" is a particular trap: a reduction of 3 to 6% shortens lengths by that factor and areas by its square, so a 3% shrink loses almost 6% of every area. Calibrate the scale against a known dimension on the drawing before you measure anything.
3. Assign colours and align on fixed points
Give the old issue one colour and the new issue another. Then align the sheets on points that cannot have moved: gridline intersections, building corners, column centres or a datum. Pick points far apart, ideally near opposite corners of the sheet, because two close points allow rotation errors to creep in. Once aligned, look at areas you know are unchanged. If they show fringes, your alignment is wrong, not the design.
Before interpreting anything, test the colour logic on one change you can already see, such as a cloud, so you know which colour means old and which means new.
4. Read the fringes
Work systematically across the sheet, for example by grid bay, rather than jumping to whatever catches the eye. For every fringe, ask whether it is a real design change, an alignment artefact or an export difference. Mark each confirmed change with a cloud and a comment, and note whether it affects quantities.
5. Read what the overlay cannot show
Overlays are weakest on text. A changed note, a specification clause or a door schedule entry may appear as a small smudge, or not at all. Check the title block revision table, dimension strings and notes near each change, then read schedules side by side with the previous issue. Overlays also struggle with redrawn but unchanged linework, which produces colour noise, and with scanned prints, which never line up perfectly.
6. Save the evidence
Save the comparison output with the date and both revision identifiers. If the question comes back months later, you can show what you compared and when.
Why clouds and covering notes are not enough
Revision clouds and delta tags are the drafter's statement of what changed. They are useful but incomplete. A cloud misses changes the drafter forgot, changes thought too small to flag, such as a note edit, knock-on changes on other sheets, and changes made in a referenced file that updated several sheets at once. The delta tag is the link between a cloud and its row in the revision table. Without it, a cloud on a sheet that has been through five issues could belong to any of them.
The practical rule: any difference found by the overlay with no cloud is a query for the design team, not an assumption. Equally, a revision note that says only "updated to comments" tells you nothing about scope. A moved setting-out point can sit quietly beside a cloud around the obvious bits. Treat the overlay as the check on the drafter, and the drafter's clouds as the check on the overlay.
Where overlays mislead
| Problem | What you see | What to do |
|---|---|---|
| Misalignment | Fringes on everything | Realign on two fixed features far apart |
| Different scales | Progressive drift across the sheet | Calibrate both pages to a known dimension |
| Cropping or export shift | Whole sheet offset | Align on the area of interest or crop both |
| Wrong pair | Large unrelated differences | Recheck number, revision and status |
| Scan skew or speckle | Noise along lines | Align by hand and verify visually |
| Text and schedules | Little or nothing | Read side by side |
The common thread is that the tool shows differences, and you decide which are changes.
Carrying confirmed changes into the take-off
Finding the change is half the work. The other half is getting it into the Bill of Quantities in a way you can defend.
Re-measure the delta, not the whole job
When a revision arrives, overlay it on the previous one, re-measure only the changed areas, and keep the old measurement until the new one is checked so you can report the change as well as the new total. Measure the delta with the same scale, units, rounding, measurement rules, coding and deduction rules as the baseline. Where the project follows NRM2, the New Rules of Measurement for detailed measurement of building works, record that measurement basis and use it on both sides of the comparison.
Reconcile with a simple formula
Keep additions and omissions as separate positive and negative quantities. The UK guide's reconciliation is: revised quantity equals baseline quantity plus additions, minus omissions, plus or minus type transfers or corrections, with each delta reference mapped to its BoQ item or cost code.
A worked example: a ground-floor partition is moved, and the overlay shows the stud wall 1.2 m longer on one run and 0.9 m shorter on another, both at 2.4 m floor to ceiling height. The addition is 1.2 m × 2.4 m = 2.88 m², the omission is 0.9 m × 2.4 m = 2.16 m², and the net change is +0.72 m². You record all three figures, not only the net, and reference the cloud and revision that produced them. Door counts and finishes linked to that wall are the knock-on items to check next.

Put the source revision on every line
Group quantities by item code and include the drawing revision in the export. The receiving workbook should total by code and show the source revision for each line, because a quantity without its source revision cannot be updated when the next one arrives. If you want the full audit-trail field list, our guide to take-off audit trail fields sets it out, and the companion piece on linking each BoQ line to its drawing revision covers the NRM2 side.
Check before sign-off
Before you approve, compare the take-off's drawing list with the current issued set and any addenda, checking revision identifiers, issue dates and affected trades. Pause approval if a newer revision changes the work until the take-off reflects it or records a clear exception. An accurate measurement of an outdated plan still gives the wrong quantity.
Once the changes are confirmed and priced, a quote-to-proposal workflow helps turn the updated figures into the revised proposal the client receives.
Keeping a clear record of issues
An overlay is only as reliable as the register behind it. A drawing issue register records the drawing number, revision and previous revision, status, date, recipients and route, the reason and description of the change, and who withdrew the superseded revision and from where. The routine is simple: confirm status, log before sending, distribute to everyone, withdraw and record the old revision, confirm receipt, check what the change touches and brief the people who will build it. All of this is set out in Construction Suite's issue register guide.
It is worth knowing where the obligation comes from. A drawing issue register is not required by name in the CDM 2015 regulations for Great Britain, where "design" includes drawings, specifications and bills of quantities. A requirement for a controlled issue record normally comes from the contract, the employer's information requirements or a BIM protocol, so check yours.
For the status codes themselves, the point is metadata: they tell the recipient what a container may be used for and where it sits in the CDE workflow. Our article on drawing revision control for QS teams turns this into a working routine for a small practice.
Where QuantiFlow fits
QuantiFlow is in development. It reads construction drawings and produces a draft Bill of Quantities for a quantity surveyor to review and sign off. The surveyor stays in charge of every judgement, including which revision is the baseline. Published plans are Solo at £69 per month and Business at £299 per month, with Enterprise on request; details are on the QuantiFlow site.
FAQ
How are revisions shown on drawings?
The revision appears in two places: the revision box in the title block, and a revision table listing each issue with its date and description. Changes are usually marked with a cloud around the altered area and a triangular delta tag carrying the revision letter or number. The tag links the cloud to its row in the table.
What letters are skipped in drawing revisions?
I and O are skipped because they are mistaken for 1 and 0 on poor prints, and many offices also skip Q. Some conventions omit further letters, so follow the standard written into your project or office CAD standard. On BIM projects, preliminary revisions typically run P01, P02 and published ones C01, C02.
What is a drawing overlay?
It is a comparison in which two revisions of a drawing are placed on top of each other in different colours. Matching areas show in a shared tone and differences show as colour fringes. It highlights where to look, but notes, schedules and re-plotted sheets need a separate read.
How do I keep track of drawing revisions?
Keep a drawing issue register recording number, revision, status, date, recipients and reason for each issue. Log before you distribute, withdraw and record the superseded revision, and confirm receipt. Record the source revision against every line in your take-off so it can be updated when the next issue arrives.
Sources
- Drawing Revision Takeoff Workflow: UK Guide
- Information management according to BS EN ISO 19650, Guidance Part C (UK BIM Framework)
- Drawing Issue Register: What to Record
- Revision history blocks on engineering drawings, explained
- Revision Control on a Drawing Set: Clouds, Deltas and Rev Tables
- S3.2 The On-Screen Take-off Workflow
- How to Review and Sign Off Construction Quantity Takeoffs
Recommended
- Drawing revision control for QS teams: an auditable workflow
- Specification Changes and Quantities: A QS Re-Measure Guide
- Cross-Referencing Drawings: A Practical Guide for QSs
- Link Each BoQ Line to Its Drawing Revision: NRM2 Takeoff for QSs
This article is for general information only and is not professional, legal or commercial advice. Quantity surveying decisions should be taken by a qualified professional with reference to the specific project, drawings and contract in question. Content is produced with AI assistance and reviewed before publication. QuantiFlow Ltd accepts no liability for reliance on it.