Blog
Discover our latest articles and blogs

5 Steps to Paperless Quantity Takeoff for UK QSs, NRM2 Ready
A five step paperless quantity takeoff workflow for UK QSs. Produce NRM2 compliant, auditable draft BoQs with checkpoints, governance, and practical limits.

Verify 1:50–1:500 Scales, Annotate Takeoffs for UK QSs, NRM2 & ISO 19650
Practical checklist for UK quantity surveyors to annotate takeoff drawings: verify 1:50–1:500 scales, log assumptions, and align annotations with NRM2 and...

6 Fields to Standardize BoQ Items for UK QSs with NRM2 and Uniclass
Make BoQ items audit ready: adopt six required fields, map NRM2 and Uniclass codes, and roll out a master template for UK QSs.

NRM2 takeoff rules to make BoQs audit ready for UK quantity surveyors
Compact, application focused NRM2 takeoff checklist for UK quantity surveyors with RICS aligned rules, short worked examples, and practical notes on...

Build an NRM2 Aligned Custom Rate Library for UK SME QS Teams
Practical guide to building an NRM2 aligned custom rate library for UK SME QS teams. Starter template, BCIS benchmarks and governance steps.

Pilot 3–5 Drawings: QS SaaS Implementation Checklist for UK QSs
Use a risk-focused checklist to pilot and roll out QS SaaS for UK quantity surveyors. Start with 3–5 drawings and align to RICS, ISO 19650 and ICO.

Speed up BoQ production in nine steps for UK SME QSs
A UK workflow for SME quantity surveyors: follow a nine-step checklist and five-stage controls to speed BoQ production while keeping NRM2 and...

Control Price Risk with Approximate Quantities for UK QSs
Practical UK QS workflow tying RICS/NRM2 and contract wording to prepare, remeasure and report approximate quantities, reduce price uncertainty and avoid...

400–800% Zoom Test: Raster vs Vector PDFs for Takeoff Teams
Use a quick 400–800% zoom and select test to spot raster vs vector PDFs, learn why vectors preserve takeoff accuracy, and how to fix raster issues like...